Les poissons en France

Tuesday, July 09, 2013

She's Happy!!

I'm pleased to report that we're on target with the floor laying on the landing.  Having finished the 'stones' above the beam and then tidied up everything I sealed the floor this morning.
We are having temperatures of 30+ everyday now, so it didn't take long before the floor had dried and I was able to start laying the adhesive floor tiles.
With the adhesive on the tiles, and the sealant on the floor, you only get one shot at putting down the tile!
However, I spent all afternoon laying the tiles and tomorrow I'll have to start doing all of the fiddley cutting where the tiles butt up against the stone walls.

 The clerk of the works is walking arround with a smile on her face!

0 Comments:

Post a Comment

<< Home